AL-GHALAA FOR MINING COMPANY

For the iron ore project in Alwahlan:

Our services include

  • Economic Feasibility Study: This study assessed the cost-effectiveness of mining operations. It involved analyzing capital and operational costs, market demand, and the expected return on investment to determine project viability.
  • Study of Mineral Resources, Reserves, and Mining Plan: Resources and reserves were estimated using advanced modeling software, and detailed mining plans were developed to maximize recovery efficiency.
  • Study of Closure and Rehabilitation: Experts designed a strategy to restore the site to its natural state, including soil stabilization, vegetation planting, and groundwater monitoring to mitigate long-term environmental impact.
  • Geotechnical Study: This involved soil and rock sampling, lab testing for physical properties, and numerical modeling to ensure slope stability and structural safety of mining infrastructure.